Rock-Edged Gravel Path
Steps 1 and 2
1. Prepare the base. To build a gravel path, begin by digging out the walk at a depth of 6 to 8 inches. Width depends on whether you want two people to be able to walk abreast or if you want to make guests line up single file. If you are going to plant alongside the walk with plants that will spill over onto the gravel, make the walk wider.
2. Add edging stones. Place large stones or pavers along the edge as a kind of retaining wall separating soil and gravel.
Steps 3 and 4
3. Lay the weed mat. Cut the weed mat to the full width of the path (or even 2 to 4 inches wider), following its curves and contours.
4. Secure the edges. Tuck the mat under the stone edging. If you have cut the mat wider than the path, the mat can climb the outer side of the edging material almost to the soil line.
Steps 5 and 6
5. Add gravel. Fill the walkway area with gravel. Smooth the surface rock with an upside-down steel-tined rake.
6. Finish. Backfill behind the large stones with removed soil.