share

Erecting Posts

After your site is laid out, the next step in the construction of many projects is the erection of posts.

12394_1_2

Posts for a deck, fence, or other structure must be absolutely plumb and firmly rooted in the earth or bolted to a concrete footing. To ward off rot, posts should be of heartwood or pressure-treated lumber, and steps should be taken to assure that water drains away from the posts. To prevent the posts from heaving, post-holes must extend below the frost line.



Instructions:

1. Stake the locations of the holes.

2. Choose depth based partly on how hard or rocky your soil is, and partly on how deep you must go to reach your area's frost line. For shallow holes in soft earth, use a clamshell digger; for hard soil or holes deeper than about 30 inches, you'll need a hand- or motor-powered auger. Most rental outlets offer all three of these tools.

3. To ensure posts are an even height, you can dig holes to a uniform depth or cut posts after concrete cures. To check depths, make a square and stake a level string. Cut the square's longer arm to reflect desired depth; shorter one rests on string when you reach that depth.

4. Determine whether you want to set the posts in the ground or on top of separate footings. Separate footings require more concrete because you must completely fill the postholes. You'll also need to insert anchors into the tops of the wet footings. (Local codes may dictate one method or the other.)

5. Good draining begins at the bottom of each posthole you dig. Wet down the hole, then pour in 2 to 3 inches of gravel. This prevents groundwater from collecting at the base of the post.

6. Put tubular forms in the holes to extend the concrete above ground. This helps keep surface water away from the posts.

7. After setting each post in place, adjust until it is plumb in two directions, then secure the post with two diagonal braces nailed to the post. If necessary, use string tied to end posts to check the alignment of intermediate posts.

8. Recheck that the posts are plumb, then backfill around any forms. Pack holes or forms with concrete, poking with a rod to remove air pockets. After the concrete has set for about 20 minutes, check the posts for plumb again and adjust if necessary. At the top of the hole or form, round off the concrete. Leave the braces in place until you're sure the posts are fixed.

9. Let the concrete cure 24 hours before doing any other work.


 

Related Links

Try these ideas to turn your backyard into a relaxing outdoor oasis.

Enhance your outdoor living spaces with beautiful garden structures. Pergolas and arbors can change the way you look at your yard.

Decorate your backyard with these great ideas from WeatherBest!

Related Videos

This fancifully shaped filled cookie is as easy as it is delicious. The spice dough can be made up to 3 months ahead, so...

What a bright idea! Recycle old Christmas lights into a uniquely żgreenż holiday centerpiece.

Add flavor to your holiday tabletop with these clever ideas to turn produce into pretty candleholders.



Comments

Comments ( 0 )
1871312868

Add your comment

Send to Facebook
 

BHG Real Estate

Find a new home

browse listings

BHG Brands

Discover our BHG-branded furniture, fabrics, bedding & more

learn more
 
  • Videos
  • Top Tools
  • Calendar
  • Win Daily
Danny Lipford: How to install a built-in ironing cabinet.

Danny Lipford: Tips to cover or remove wallpaper.

Danny Lipford: Tubular sky light.

Wreath

Holiday Screen Savers

Your holiday decorating starts with just a few clicks using our FREE screen savers!

View this tool

All Top Tools

Todays Daily Prize
ADVERTISEMENT



 

 
By using this site, you agree to our Terms of Service.